Chalets and lakeside homes
Hot tub, EV charger, heat pump: every addition goes through the panel. We check the service entrance capacity before you buy the appliance, then install the circuit with the protection required near water.
Monday to Friday, 8 a.m. to 4 p.m.
Outages (Live power outages) : Hydro-Québec, Hydro-Sherbrooke and weatherRBQ licence 5874-5597-01william@lteelectrique.comFR










TurnkeyFrom the first call to the final check.Free estimate within 24 hours; work usually starts less than a week after you approve, depending on the project.Request an estimate Guides by topic
All 33 guidesFree tools
All toolsClear answers to the questions we hear most often.
A project in mind?
Free estimate within 24 hours, often from your photos.
No sign-up. Nothing is sent unless you request a quote.
Memphrémagog region
LTE Électrique works in Stanstead Township, in Fitch Bay, Georgeville and around Lake Memphrémagog, for houses, chalets and farms: generators, hot tubs, EV chargers, panels and 200 A upgrades, heat pumps. The township has many seasonal residents: for a second home, we do a first assessment from your photos.
Our shop, 5340 Montpetit StreetCircles every 10 km, as the crow flies© OpenStreetMap
Hot tub, EV charger, heat pump: every addition goes through the panel. We check the service entrance capacity before you buy the appliance, then install the circuit with the protection required near water.
In the countryside, an outage can last. A generator connected through a transfer switch keeps the well, the heating and the fridge running, with no danger to line workers.
The grants related to our work, checked on the official pages. You apply yourself; we give you detailed invoices and proof of installation.
Government of Québec, Écorecharge program
$600
The owner of an electric or plug-in hybrid vehicle registered in Québec, in a house or duplex (one or two units).
Hydro-Québec, LogisVert program
$50 or $120 per 1,000 BTU/h
Owners of houses, year-round chalets, condos and plexes.
Hydro-Québec, LogisVert program
$250
Owners and tenants.
Government of Canada
Up to $10,000 or $2,000
Announced, not yet open
Per the October 8, 2026 announcement: up to $10,000 for households below median income, $2,000 for other eligible households.
Stanstead Township has no municipal power network: the utility is Hydro-Québec. In the Eastern Townships, only Sherbrooke (in part of its territory), Magog and Coaticook have their own network.
SourcePDFTo report an outage to Hydro-Québec: 1 800 790-2424, or the online Info-pannes service (page checked on October 16, 2026).
SourceStanstead Township has 1,137 permanent residents and 903 seasonal residents (regional data).
SourceStanstead Township is made up mainly of the hamlets of Fitch Bay and Georgeville.
SourceNear Fitch Bay, the 28-metre Narrows covered bridge was built in 1881.
SourceQuébec pays $600 for an eligible connected charger. We install the charger and its circuit, and give you the invoice that serves as proof. Before buying, the load calculation tells whether the service is enough.
In Stanstead Township, the disconnection and reconnection are coordinated with the utility: Hydro-Québec. We handle it for you. The load calculation first tells whether the service is enough.
« Super service de William. Il répond rapidement aux demandes et prend le temps de bien expliquer les choix aux clients. Ils se sont présenté à l’heure déterminée et le résultat du travail est clean. Ils ont pris le temps de tout tester avant de partir. Sa plate-forme d’envoi de photo pour estimation et facturation est super simple d’utilisation aussi. Bref, je recommande assurément. »« L’équipe est professionnelle, ponctuelle et très compétente. Les travaux ont été réalisés avec soin et tout a été laissé propre à la fin. La communication a été excellente du début à la fin, et ils ont pris le temps de répondre à toutes mes questions. »Call or text 819 570-9836. Free estimate within 24 hours, anywhere in Sherbrooke and the Eastern Townships.
Monday to Friday, 8 a.m. to 4 p.m.
5.0 from 43 Google reviews