Country homes and farm buildings
Garage, workshop, barn: a separate building is fed by a sub-panel, with a cable sized for the distance. We calculate the total load before proposing a solution.
Monday to Friday, 8 a.m. to 4 p.m.
Outages (Live power outages) : Hydro-Québec, Hydro-Sherbrooke and weatherRBQ licence 5874-5597-01william@lteelectrique.comFR










TurnkeyFrom the first call to the final check.Free estimate within 24 hours; work usually starts less than a week after you approve, depending on the project.Request an estimate Guides by topic
All 33 guidesFree tools
All toolsClear answers to the questions we hear most often.
A project in mind?
Free estimate within 24 hours, often from your photos.
No sign-up. Nothing is sent unless you request a quote.
Coaticook region
LTE Électrique works in Stanstead-Est, south of Sherbrooke in the Coaticook region, for country homes, farms, farm buildings and new builds: service entrances and panels, 200 A upgrades, generators, heat pumps, EV chargers. On a large rural territory, we plan power for secondary buildings and the generator from the first visit.
Our shop, 5340 Montpetit StreetCircles every 10 km, as the crow flies© OpenStreetMap
Garage, workshop, barn: a separate building is fed by a sub-panel, with a cable sized for the distance. We calculate the total load before proposing a solution.
Underground or overhead service, meter location, capacity for a charger and a heat pump: we settle these choices with you at the plan stage, then coordinate the connection with Hydro-Québec.
The grants related to our work, checked on the official pages. You apply yourself; we give you detailed invoices and proof of installation.
Government of Québec, Écorecharge program
$600
The owner of an electric or plug-in hybrid vehicle registered in Québec, in a house or duplex (one or two units).
Hydro-Québec, LogisVert program
$50 or $120 per 1,000 BTU/h
Owners of houses, year-round chalets, condos and plexes.
Hydro-Québec, LogisVert program
$250
Owners and tenants.
Government of Canada
Up to $10,000 or $2,000
Announced, not yet open
Per the October 8, 2026 announcement: up to $10,000 for households below median income, $2,000 for other eligible households.
Stanstead-Est has no municipal power network: the utility is Hydro-Québec. In the Eastern Townships, only Sherbrooke (in part of its territory), Magog and Coaticook have their own network.
SourcePDFTo report an outage to Hydro-Québec: 1 800 790-2424, or the online Info-pannes service (page checked on October 16, 2026).
SourceThe municipality of Stanstead-Est was founded on July 16, 1932, and covers 115.28 km².
SourceQuébec pays $600 for an eligible connected charger. We install the charger and its circuit, and give you the invoice that serves as proof. Before buying, the load calculation tells whether the service is enough.
In Stanstead-Est, the disconnection and reconnection are coordinated with the utility: Hydro-Québec. We handle it for you. The load calculation first tells whether the service is enough.
« Super service de William. Il répond rapidement aux demandes et prend le temps de bien expliquer les choix aux clients. Ils se sont présenté à l’heure déterminée et le résultat du travail est clean. Ils ont pris le temps de tout tester avant de partir. Sa plate-forme d’envoi de photo pour estimation et facturation est super simple d’utilisation aussi. Bref, je recommande assurément. »« L’équipe est professionnelle, ponctuelle et très compétente. Les travaux ont été réalisés avec soin et tout a été laissé propre à la fin. La communication a été excellente du début à la fin, et ils ont pris le temps de répondre à toutes mes questions. »Call or text 819 570-9836. Free estimate within 24 hours, anywhere in Sherbrooke and the Eastern Townships.
Monday to Friday, 8 a.m. to 4 p.m.
5.0 from 43 Google reviews